Say that title 3 times....installation of insulation...installation of insulation...installation of insulation--means drywall must be near!
We went to the house hoping to see the siding done (it is about 80% done) and were surprised to see plastic on the windows--and about 75% of the insulation!!!
Here are some photos:
 |
| This is the family room--fireplace on the left |
 |
| Collin's room--he is so excited about the corner windows! |
 |
| Sarah's room--her window faces south |
 |
| Our room--check the trey ceiling! And yes, that is Wally, trying to get out of the picture! |
 |
| Siding above the garage |
 |
So gorgeous with the blue sky!
So--we are getting there--we are over 1/2 way done--still targeting mid October--the builder said final walk through is usually 8 weeks from drywall.....while apartment life is good, house life will be better!
Keep coming back for more posts! |
No comments:
Post a Comment